Monday, December 22, 2014

Well Project

Our well stopped producing water quite a few weeks ago but I am just now getting around to blogging about the fixing of the problem. In order to get out well going again we had to dig a whole new trench and lay some pipe. The whole process took about a week.

We rented an excavator and called Michael to come and run it. He came and was here for a day and a night.



Micheal did a really good job and got the job done well. 

John

Even though there were a lot of very excited things going on outside we still had school that need to be done. We did get a break to go out and watch the work, when we brought the boys lunch.

After Michael finished the trench we had a cave in. Dad and Ben thought up a plan and the next day they set to cleaning it out. They ended up attaching an old flywheel on to a long board and pulled it with the tractor. It worked but it took a few tries.

Our cousin Aaron was up for the visit and was great having a few more hands to help.

Part of the trench

We had to speed up when this beautiful storm came up. 

Working together to get stuff up before the rain.







The pipe laid and the rock down.

We got it done and we have abundant amount of water. Praise The Lord

No comments:

Post a Comment